Boozt

Tenant Project & Fit-out Advisory · 477 m² · Poznań Financial Centre

Boozt office in Poznań — lounge and collaboration area
Area477 m²
LocationPoznań Financial Centre
RoleTenant Project & Fit-out Advisory
Designed occupancy27 users / shift
01 / CHALLENGE

Privacy, focus and technical comfort

The client had two main concerns: sound transmission between rooms and the performance of ventilation and air-conditioning in an older office building, particularly with part of the ceiling left exposed.

For an IT workplace, acoustic privacy and concentration are operational requirements. HVAC performance also had to provide stable comfort without introducing excessive equipment noise into the workspace.

02 / ROLE

Tenant representation from building standard to handover

The assignment covered tenant-side representation throughout the fit-out process — from reviewing the landlord delivery standard and technical lease provisions, through change coordination, to final inspections.

  • Lease & technical reviewreview of landlord deliverables and technical fit-out provisions.
  • Cost & contractor controlcost review, contractor negotiations and change verification.
  • Schedule & coordinationprogramme review and coordination of tenant-driven changes.
  • Handoverquality inspections, snagging and readiness for occupation.
03 / KEY DECISIONS

The details hidden behind the finished interior

01

Acoustic continuity

Partition build-ups and critical façade interfaces were challenged and controlled to reduce flanking sound paths between rooms.

02

Perimeter trench heating

The partition/heating interface was corrected so the perimeter heating did not create an open sound path below the room separation.

03

HVAC matched to function

The air-conditioning solution serving meeting rooms was reviewed and adjusted to suit the actual functional split and expected user comfort.

The project specification explicitly required acoustic performance of partitions and careful façade interfaces. Part of the office also used exposed ceilings and visible services, making HVAC coordination directly relevant to acoustic comfort.

04 / RESULT

Ready for occupation as planned

The project was completed on schedule and within the agreed budget. Pre-handover snagging reduced the number of final defects and allowed the client to occupy the space in line with the plan.

477 m²project area
On timeplanned occupation
On budgetcost control
05 / PROJECT GALLERY

The finished space

The completed Boozt office at Poznań Financial Centre.